
This study would like to analyze the detail of contract of Thailand’s transportation projects, those are Second stage Expressway System (SES), The Don-muang Tollway project, and Bangkok Mass Transit System (BTS). This study concentrated on the differtences in the detail of contract and analysis the problems for each projects. By collecting and discussing all of the informations, the project will finally give conclusions and suggestions for the futher projects.